Please have a look through some of our recent projects; there are a few examples below but you can also search by category and can download a pdf document giving more detail on each project.

Shotley Bridge Cricket Club

M Design were successful in getting the Environment Agency to actually amend their flood plans following this complicated flood risk assessment. The site was complicated by a reservoir in the catchment so the hydrology side of things was interesting. The site was fully modeled using HEC RAS to the satisfaction of the Environment Agency (and our client!)

Download supporting document

Ryton New Build Dwelling

This was ideal project for M Design (and our client!) as we were able to design every aspect of the proposed property. We obtained planning permission, building regulation approval and completed structural design on a raft foundation, retaining walls and various steel, timber and masonry elements. To improve the prospects of selling the property we prepared a large 3D visualisation image to advertise the property.

Download supporting document

KEVI Athletics Track & Changing Rooms

M Designed fully designed and detailed the track and the new changing room buildings. Including planning drawings, earthworks, lighting and the full facility to Sports England approval and to SAPCA regulations. A fantastic scheme; one we very proud of!

Download supporting document